The final steel verticle beams went up on Sept. 17, 2007. Support beams/crossing beams are now going up on the very south building. The duct work for HVAC is being placed in the north building. Sprinkler systems are being put in as well. The skin of the building is starting to go up as well. The footprint of the building is larger than a football field. It is 418 feet or 139 yards long. Tom Barnett