Work continues at the site---The final footers at the front door were poured today. The footer work was completed twice as fast as usual per the "Walker" company foreman. The steel will be delivered on Monday and Tuesday and start to be erected on Tuesday, Aug 7, 2007. The pond work is 98% complete. The pipes coming into the pond have been set. The grading of the site continues. About 6,000 yards of fill dirt still need to be transferred from the east side of the property to the west side. In addition we have 30,000 yards of topsoil that needs to be taken off site. Essentially if someone is willing to transport it off site it is theirs! Otherwise we will have to pay $102 per truck load (2-3,000 truck loads) to transport it off site. --Tom Barnett